Building Construction Process Step by step Guide
Building a construction process from stat to finish involve in any type of construction is not an easy task; perhaps it requires lots of afford and investment. Although, building construction requires lots of time and is tedious work, yet its result is a permanent asset for us.
Therefore, care should be taken in the building construction process. Before planning, building construction projects must consider important aspects of house construction steps like the purpose of construction, utility, financial proficiency, the demand for work, etc.
Following are the steps involved in Building Construction Process from Start to Finish:
I) Pre-Construction Steps(Phase – I) :
1) To Acquire Land or Plot:
2) To Seek Technical Help:
3) Preparing Estimate and Budget:
4) Permission from Authorities:
5) Approach a Builder:
Building Construction Step (Phase – II):
1) Site Preparation or Leveling:
2) Excavation and PCC:
3) Foundation:
4) Plinth Beam and Slab:
5) Superstructure – Column:
6) Brick Masonry Work:
7) The Lintel Over Door Window Gaps:
8) Floor Slab or Roof Structure:
9) Door Window Framing and Fixations:
10) Electrical and Plumbing:
11) Exterior Finishing:
12) Terrace and Roof Finishing:
13) Internal Finishing:
14) Woodwork and Fixture Fittings: